Reduce waste in software development with 3M model: Muda, Mura, Muri
Last updated: July 29, 2025 Read in fullscreen view



- 01 Apr 2022
Ishikawa (fishbone) diagram in software project management 2723
- 09 Sep 2022
Kaizen, Kaikaku and Kakushin – what’s the difference? 2482
- 24 Nov 2022
Genba Genbutsu Genjitsu (3Gs), (Go to the Genba & see for yourself!) 2480
- 10 Nov 2021
5S methodology - the SECRET to Japanese SUCCESS 1262
- 02 Feb 2022
Yokoten: Best Practice Sharing from a success 1159
- 27 Oct 2020
8 principles of Agile Testing 1101
- 21 Dec 2023
Top 12 Low-Code Platforms To Use in 2024 1048
- 01 Oct 2020
Fail fast, learn faster with Agile methodology 867
- 18 Oct 2020
How to use the "Knowns" and "Unknowns" technique to manage assumptions 814
- 21 May 2022
"Fail Fast, Fail Often, Fail Forward" is the answer to Agile practices of software success 803
- 16 Jun 2022
Rapid Application Development (RAD): Pros and Cons 759
- 03 Jan 2024
What is the Ringi process? 720
- 09 Sep 2022
What is 5 Whys (Five Whys)? 710
- 14 Oct 2021
Advantages and Disadvantages of Time and Material Contract (T&M) 703
- 13 Jul 2022
Applying the business mantra "HORENSO" to Achieve 360-degree Communication 699
- 01 Dec 2023
What is Amoeba Management? 696
- 19 Oct 2021
Is gold plating good or bad in project management? 672
- 09 Oct 2022
Key Advantages and Disadvantages of Agile Methodology 655
- 29 Aug 2022
Difference between Kaizen and Innovation 626
- 20 Jan 2021
Fail early, fail often, fail cheap, fail safe but always fail forward 614
- 19 Oct 2021
Software development life cycles 614
- 27 Aug 2022
Kaizen - Culture of Continuous Improvement and Lean Thinking 589
- 15 Jul 2022
Hansei Methodology: Continuously Engaging People in Improvement 560
- 06 Mar 2021
4 things you need to do before getting an accurate quote for your software development 557
- 01 Mar 2022
The Toyota Way Management Principles 556
- 01 Jan 2023
How To Use Poka-Yoke (Mistake Proofing) Technique To Improve Software Quality 540
- 28 Jul 2022
POC, Prototypes, Pilots and MVP: What's the differences? 523
- 15 Apr 2022
Total Quality Management (TQM) - Japanese-style management approach to quality improvement. 520
- 08 Oct 2022
KPI - The New Leadership 514
- 19 Apr 2021
7 Most Common Time-Wasters For Software Development 513
- 01 Sep 2022
Facts Chart: Why Do Software Projects Fail? 500
- 21 Jun 2021
6 Useful Tips To Streamline Business Processes and Workflows 476
- 18 Jul 2021
How To Ramp Up An Offshore Software Development Team Quickly 454
- 12 Oct 2022
14 Common Reasons Software Projects Fail (And How To Avoid Them) 444
- 12 Oct 2020
The Agile Manifesto - Principle #8 422
- 06 Jun 2022
HEIJUNKA: The art of leveling production 418
- 19 Sep 2022
Jidoka in Software Development and Odoo ERP/MRP 411
- 19 Jul 2022
The 12 Principles of Continuous Process Improvement 390
- 28 Dec 2021
8 types of pricing models in software development outsourcing 388
- 20 Jan 2022
TIGO Self-Organization Practice: Change Management Workflow 386
- 13 Oct 2021
Outsourcing Software Development: MVP, Proof of Concept (POC) and Prototyping. Which is better? 384
- 02 Nov 2023
Unlocking Success with The Amoeba Management Model: Key Lessons, Pros & Cons, and Finding the Perfect Fit 374
- 31 Oct 2021
Tips to Fail Fast With Outsourcing 359
- 11 Jan 2024
What are the Benefits and Limitations of Augmented Intelligence? 357
- 16 Apr 2021
Insightful Business Technology Consulting at TIGO 354
- 07 Jul 2021
The 5 Levels of IT Help Desk Support 342
- 16 Jul 2022
What are disadvantages of Agile Methodology? How to mitigate the disadvantages ? 341
- 28 Oct 2022
Build Operate Transfer (B.O.T) Model in Software Outsourcing 340
- 23 Sep 2021
INFOGRAPHIC: Top 9 Software Outsourcing Mistakes 338
- 12 Dec 2021
Zero Sum Games Agile vs. Waterfall Project Management Methods 335
- 16 Sep 2022
Examples Of Augmented Intelligence In Today’s Workplaces Shaping the Business as Usual 332
- 11 Nov 2021
What is an IT Self-service Portal? Why is it Important to Your Business? 330
- 31 Dec 2022
The New Normal for Software Development 327
- 13 Feb 2021
Why is TIGOSOFT a software house for Enterprise Application Development? 325
- 02 Nov 2022
Frequently Asked Questions about Agile and Scrum 324
- 10 Dec 2023
Pain points of User Acceptance Testing (UAT) 324
- 10 Apr 2022
Agile self-organizing teams: What are they? How do they work? 323
- 06 Feb 2021
Why fail fast and learn fast? 312
- 05 Mar 2021
How do you minimize risks when you outsource software development? 305
- 03 Apr 2021
How digital asset management streamlines your content workflow? 288
- 27 Jul 2024
Positive Psychology in the Digital Age: Future Directions and Technologies 284
- 20 Nov 2022
Agile working method in software and football 283
- 04 Oct 2021
Product Validation: The Key to Developing the Best Product Possible 280
- 13 Dec 2020
Move fast, fail fast, fail-safe 280
- 11 Oct 2022
Why choose Billable Viable Product (BVP) over Minimum Viable Product (MVP) 279
- 01 May 2023
CTO Interview Questions 279
- 01 Dec 2022
Difference between Set-based development and Point-based development 278
- 02 Nov 2021
[Case Study] Streamlined Data Reporting using Tableau 264
- 04 Mar 2024
Tree Ring Management: Take the Long Term View and Grow Your Business Slowly 257
- 03 Nov 2022
Top questions and answers you must know before ask for software outsourcing 253
- 17 Feb 2022
Prioritizing Software Requirements with Kano Analysis 244
- 01 Jun 2020
Japan Business Review (JBR) 244
- 04 Oct 2022
Which ERP implementation strategy is right for your business? 242
- 07 Oct 2020
How To Manage Expectations at Work (and Why It's Important) 237
- 01 Mar 2022
Why Does Scrum Fail in Large Companies? 230
- 11 Jan 2022
Lean Thinking and Lean Transformation 228
- 18 Aug 2022
What are the consequences of poor requirements with software development projects? 227
- 07 Aug 2022
Things to Consider When Choosing a Technology Partner 226
- 03 Jul 2022
Manifesto for Agile Software Development 226
- 10 Apr 2021
RFP vs POC: Why the proof of concept is replacing the request for proposal 225
- 12 Mar 2022
The u-Japan concept 224
- 20 Nov 2022
Software Requirements Are A Communication Problem 219
- 28 Nov 2023
Scrum Team Failure — Scrum Anti-Patterns Taxonomy (3) 218
- 06 Nov 2019
How to Access Software Project Size? 215
- 16 Aug 2022
What is a Headless CMS? 208
- 19 Dec 2023
How AI is Transforming Software Development? 203
- 10 Nov 2022
Poor Code Indicators and How to Improve Your Code? 200
- 11 Jul 2022
Lean software development - the game-changer in the digital age 197
- 02 Dec 2024
The Intersection of AI and Business Analytics: Key Concepts to Master in Your Business Analytics Course 195
- 01 Dec 2023
Laws of Project Management 195
- 02 Dec 2022
Success Story: Satsuki - Sales Management Software, back office app for School Subscription Management 194
- 31 Aug 2022
What are the best practices for software contract negotiations? 194
- 01 Jun 2022
How Your Agile Development Team is Just Like a Football Team? 193
- 08 Nov 2022
4 tips for meeting tough deadlines when outsourcing projects to software vendor 193
- 18 Jan 2024
Self-healing code is the future of software development 186
- 26 Dec 2023
Improving Meeting Effectiveness Through the Six Thinking Hats 181
- 09 Feb 2023
The Challenge of Fixed-Bid Software Projects 180
- 03 Sep 2022
The secret of software success: Simplicity is the ultimate sophistication 177
- 01 Mar 2023
Bug Prioritization - What are the 5 levels of priority? 171
- 09 Mar 2022
Consultant Implementation Pricing 168
- 01 May 2024
Warren Buffett’s Golden Rule for Digital Transformation: Avoiding Tech Overload 165
- 07 Oct 2022
Digital Transformation: Become a Technology Powerhouse 164
- 06 Nov 2023
How do you streamline requirement analysis and modeling? 160
- 09 Jan 2022
How to Bridge the Gap Between Business and IT? 150
- 18 Jul 2024
The 8 Best ways to Innovate your SAAS Business Model in 2024 149
- 10 Sep 2024
AI in Email Marketing: Personalization and Automation 143
- 16 Feb 2021
Choose Outsourcing for Your Non Disclosure Agreement (NDA) 143
- 03 Nov 2023
Why Is Billable Viable Product An Alternative To Minimum Viable Product? 142
- 01 Jan 2024
The pros and cons of the Centralized Enterprise Automation Operating model 142
- 31 Dec 2023
Software Development Outsourcing Trends to Watch Out for in 2024 142
- 27 Feb 2025
How AI Agents are Changing Software Development? 141
- 05 Sep 2023
The Cold Start Problem: How to Start and Scale Network Effects 140
- 25 Sep 2024
Enhancing Decision-Making Skills with an MBA: Data-Driven Approaches for Business Growth 137
- 01 Mar 2023
How do you deal with disputes and conflicts that may arise during a software consulting project? 137
- 03 Jan 2024
Why Partnership is important for Growth? 135
- 21 Oct 2022
Virtual meeting - How does TIGO save cost, reduce complexity and improve quality by remote communication? 135
- 05 Jan 2024
Easy ASANA tips & tricks for you and your team 132
- 18 Aug 2024
The Future of Web Development: Emerging Trends and Technologies Every Developer Should Know 129
- 22 Nov 2024
The Role of AI in Enhancing Business Efficiency and Decision-Making 119
- 31 Dec 2022
Future of Software Development Trends and Predictions for 2023 116
- 06 Mar 2024
[SemRush] What Are LSI Keywords & Why They Don‘t Matter 111
- 30 Jul 2024
The Future of IT Consulting: Trends and Opportunities 110
- 10 Sep 2024
Leading Remote Teams in Hybrid Work Environments 109
- 12 Mar 2024
How do you create FOMO in software prospects? 98
- 10 Oct 2022
Should Your Business Go Agile? (Infographic) 98
- 09 Oct 2024
Short-Form Video Advertising: The Secret to Captivating Your Audience 89
- 10 Jul 2025
Building AI-Driven Knowledge Graphs from Unstructured Data 89
- 14 Mar 2024
Why should you opt for software localization from a professional agency? 85
- 12 Aug 2024
Understanding Google Analytics in Mumbai: A Beginner's Guide 70
- 20 Aug 2025
What Is Agentic AI? The Next Phase of Artificial Intelligence 66
- 23 Jun 2025
AI Avatars in the Metaverse: How Digital Beings Are Redefining Identity and Social Interaction 65
- 25 Jan 2025
The Decline of Traditional SaaS and the Rise of AI-first Applications 57
- 20 Feb 2025
How Machine Learning is Shaping the Future of Digital Advertising 54
- 17 Mar 2025
IT Consultants in Digital Transformation 48
- 07 Mar 2023
Japan’s Unusual Farming Strategy: Renting Land and Leaving It Fallow for 5 Years — Here’s the Truth… 26
Muda - The Waste of Non-Value-Adding Activities
Muda, the standard 7 wastes: Over-Production, Inventory, Motion, Defects, Over-Processing transport & Waiting.
Literally translated, muda means “futility; uselessness; wastefulness,” though more broadly it refers to the seven common types of waste seen in business:
And don’t forget the human wastes: Talent, Focus and Communication waste.Defects in the end product
- Time lost due to waiting for processes
- Non-essential movement
- Excess material or equipment inventory
- Excessive production
- Redundant processes
- Unnecessary transport or handling of materials or products
Mura - The Waste of Inconsistency, Unevenness and Variability
Mura, losses due to variation.
Mura refers to “unevenness” or “irregularity” -- specifically, irregularity in production levels. Consistently stable levels of production allow a business to effectively implement maintenance procedures and reduce worker fatigue, while uneven production leads to more frequent equipment failures, employee burnout, and increased difficulty in accurately planning for the future.
Variation can be found in every part of the process:
- Processes that are not well balanced
- Fluctuating customer demand
- Machine breakdowns and delays
- Variation created by downtimes (man/machine)
- Repetitive actions of a person or machine that deviate from the baseline
- Impact of defects
- Insufficient staff present
- Not having the right materials and tools
Muri - The Waste of Overburdenning
Muri, losses due to the overloading your people and/or machines. Forcing the development team to work extra hard to meet the deadline will end up in overburdenning (無理 muri). Overburdenning will only make the organisation fragile rather than sustainably agile. Overburdenning in software development, as in manufacturing, will end up in low quality product. But unlike in manufacturing, low quality software are not easily noticeable to managers and even to customers because you have to dig through the codes to find out the rot. And because of this reason deadline limits organisation agility. Organisation should shift its focus and start investing in infrastructure for release on demand so that their customers or Product Owners can release the software to production environment anytime they need it with a single click of a button.
“Beyond one’s power” is an especially potent definition for muri, as it refers to employees or equipment that have been overburdened. The dangers of muri should be obvious. Employees who are overworked experience greater levels of burnout, and a lack of situational awareness caused by exhaustion can be extremely dangerous, particularly in industries that rely on heavy machinery or dangerous chemicals. Likewise, equipment that’s stressed too much will break down more frequently, and can create wholly new hazards for anyone nearby.
All lean companies strive to eliminate muda, mura, and muri, but it’s important to explicitly identify all sources of waste before deciding on a removal plan. Muda, mura, and muri feed into and directly impact one another, and it’s all too easy to decrease muda only to see muri increase. Or for mura to decrease while muda increases. To avoid a painful, drawn out game of inefficiency whack-a-mole, muda, mura, and muri should be combated simultaneously, using a holistic approach that trades quick, superficial fixes for entrenched improvements in business processes.
If you overstretch or overstress people and machines, you create safety risks, quality loss and even health problems.
Typical causes
- Workplace organisation that has not be thought through
- A lack of (preventive) maintenance, unreliable machines
- A lack of reliable processes
- A lack of the right tools
- Insufficiently trained staff
- Over-planning of the production equipment
- Excessive fluctuation of the customer demand
Muda in Software Development
Which forms of waste cannot be adapted to Software Development?
Eliminating something is way easier than understanding a system, finding the waste and acting properly. Again, acting properly.
Muda is an activity in the process which doesn’t add value to the product. When we are talking about waste we are actually referring to muda. According to the Toyota Production System muda falls into seven major categories.
Over-processing: Addition of feature not considered in the project scope (Gold Plating)
This kind of waste is generated when we add things to the product that the customer didn’t ask for (aka Gold Plating). Developing these things takes time and money, they unnecessarily increase the complexity of the system, and increase the possibility that new problems will appear. For example, your customer asks for a simple website and you deliver a complete JavaEE solution when a static website have done the trick.
Example:
- Too strict rules for development (processes, methodology,…).
- Very complex workflow in JIRA that everyone only skips when the request is done and they want to close it
- Too much focus on measurement and reporting
- A status meeting has no value to the customer.
For example: After having met the requirements, the project manager or the developer works on further enhancing the product, thinking the customer will be delighted to see additional or more polished features, rather than what was asked for or expected. The customer might be disappointed in the results, and the extra effort by the developer might be futile.
Tip: Avoid extra features by validating assumptions about value and needs in short feedback cycles.
Over-production: Too much nice-to-have and could-have features
Over-production happens when an organization does not understand the change in the customer demand and therefore produces too much or too early. In other words, you have an existing product, and you are adding features to this product, but they no longer provide value to your customers or they cannot use them at all. For example, adding features to a website which runs only in Internet Explorer.
Nice-to-have and could-have features do not add value at this time, but probably turn to must-have in next phase (i.e. 5 years later when the customer base is growing rapidly). It is the theory of Kano analysis for product strategies.
Example: Production of more and more functionalities without ongoing customer feedback.
Transportation: Lack of communication, lack of transparency and ambiguity are key problems in software project
The transportation waste is generated when materials are moved around the factory. Moving materials is expensive and dangerous. Fortunately, we don’t move materials around the office, but we move a lot of information through several unnecessary middlemen. This can take some time and in the meantime the information can change, get lost or become obsolete. For example, you cannot talk directly to the other teams or cannot download logs from the production system.
Example:
- Distributed information changes all the time
- Sending bugs between systems when searching a solution, sometimes without further analysis (sometimes you hear the developer's justification: now it’s not my issue….)
- Frequent focus switching between many parallel projects and parallel tasks, broken focus
- Passing the request between many subcontractors (internal and external)
Tip: Handoffs can be minimised, even eliminated, by building autonomous, cross-functional teams that have everything they need to go from concept to cash.
Motion: Wrong tools, wrong methodologies are the implicit matters behind project delay
Motion is very similar to transportation, but it is about the people. This waste is generated when the people have to make rounds in order to get the job done, they are using the wrong tools, don’t have all the information to do the job, or get reassigned. For example, you have to use gedit for javascript development, because your company doesn’t want to buy you a more suitable development environment.
Example:
- Sending a completely finished request for approval back and forth over and over again
- Meetings that do not add value
- Distraction from work
Corrections: Defects, Bugs and Technical Debts are kinds of wastes
In other words: defects or bugs. They are the result of poor code quality (bug) or poor software specification (defect). Fixing the issues in the system won’t eliminate this kind of waste. Instead, it will hide them, or transfer them to a different place. This kind of waste is a well known sign that something is wrong in the process. The right move here is to find the place which is malfunctioning and fix it.
Inventory: Unused deliverables, useless artifacts are kinds of wastes
Inventory waste is generated when the output of a phase cannot be immediately used by the next phase, or the finished product cannot be delivered to the customer. For example, your architects are writing you studies about what the system should support next year, but the developer teams cannot pull anything from them for months.
Example:
- Analysis that we will need in the future (maybe)
- Done but not deployed code
- Unused tools and licenses
- Preparation of extensive or duplicate documentation that is not used
Similarly to partially done work, context switching can be addressed by limiting work-in-process. Context switching due to unplanned work (for example, incidents) can be tackled by learning about (and addressing) the root causes of incidents (post-incident reviews). Context switching can also be a symptom of poor prioritisation and this can be addressed by prioritisation frameworks (cost of delay).
Waiting
Waiting is a very tricky one, because its quantity is highly subjective: I would say that I’ve been waiting for a long time now after waiting 3 or 4 hours, but my girlfriend would say this after 20 minutes. By definition, the waiting waste is generated when a team member is idle, because he or she cannot do anything at all. For example, testers are waiting for the new package installation to be finished. They cannot do anything (testing, improvements, etc.), because their system is being installed. Pulling a work item from a different queue doesn’t make too much sense either. The installation will definitely be finished before they can finish the pulled item, and finishing the item will delay the real testing work. So they stay idle instead.
Example:
- Waiting for the subcontractor team to start addressing our request
- Waiting for prioritization results
- Waiting for the availability of the test environment
- Waiting for accesses
- Waiting for release
Muri in Software Development
Mura in Software Development
Mura refers to inconsistency, unevenness or unbalanced demand situations in the system. For example, the workload is usually not that high at the beginning of the project, but always becomes high at the end of it. Unfortunately, Mura is a bit underrated, but it is important to know that it generates Muda and Muri. For example, when the demand increases, most of the people start to make mistakes (correction waste), forget important details (transportation waste), have to report more (administration waste) or get reassigned (motion waste). When the demand is lower, we tend to pile up work (inventory waste) or do what we think is necessary (over-processing waste).
Conclusion
Muda is a result of Muri and Mura. Blindly removing Muda will maybe remove the symptoms, but not the root causes.
By applying the principles of Muda, Muri, and Mura in software development, teams can reduce waste, avoid overburdening, and achieve a more even and predictable workflow. This leads to improved efficiency, quality, and employee satisfaction, ultimately delivering better software products.